GovTwin / Institution
Baraka Power Limited
Autonomous
Managing Director: Md. Fahim Ahmed Chowdhury. Chairman: Mr. Faisal Ahmed Chowdhury. Incorporated June 26 2007; listed DSE May 16 2011 (ticker: BARKAPOWER). Parent: Baraka Group. Key subsidiary plants: Karnaphuli Power Limited (110 MW HFO, Chittagong) and Baraka Shikalbaha Power Limited (105 MW HFO). Main plant: Fenchugonj 51 MW (Sylhet). DSE shows 'Operation Shutdown' status as of June 8 2026. Authorized capital: BDT 4,000 million. Under Ministry of Power, Energy and Mineral Resources power purchase framework.
Indicators
Tracked, awaiting data (4): autonomous_cost_recovery_rate_pct, autonomous_research_output_index, energy_installed_capacity_mw, energy_system_loss_transmission_pct