GovTwin / Institution
Bangladesh Power Development Board
Soe
Planning and developing national power infrastructure, operating power generation facilities, and managing electricity distribution primarily in urban areas
Indicators
| Series | Role | Latest | As of | Source |
|---|---|---|---|---|
| ged_power_overcapacity_pct | merit_order_efficiency | 43.50 | 2024-06-30 | BPDB / Planning Commission GED |
| ged_renewable_energy_total_capacity_mw | energy_transition | 1,447.90 | 2024-06-30 | SREDA / Planning Commission GED |
| iepmp_cumulative_power_investment_b_usd | responsible | 157.00 | 2050-12-31 | Integrated Energy and Power Master Plan (IEPMP) 2023 |
| iepmp_total_power_supply_capacity_gw | responsible | 122.00 | 2050-12-31 | Integrated Energy and Power Master Plan (IEPMP) 2023 |
| Access to electricity (% of population) | responsible | 99.50 | 2024-12-31 | world_bank |
Tracked, awaiting data (21): bbs_stat_yearbook2022_power_generation_capacity_mw, bgdcl_power_sector_gas_sales_mmcm, bpdb_power_bulk_billing_bdt_cr, bpdb_power_bulk_collection_bdt_cr, bpdb_power_bulk_supply_cost_bdt_kwh, bpdb_power_bulk_tariff_bdt_kwh, bpdb_power_distribution_loss_pct, bpdb_power_installed_capacity_mw, bpdb_power_net_generation_mkwh, bpdb_power_peak_generation_mw, bpdb_power_per_unit_fuel_cost_bdt_kwh, bpdb_power_per_unit_generation_cost_bdt_kwh, bpdb_power_single_buyer_generation_mkwh, bpdb_power_total_system_loss_pct, energy_installed_capacity_mw, energy_system_loss_transmission_pct, plancomm_ssp_installed_capacity_fy20_mw, plancomm_ssp_per_capita_generation_fy20_kwh, soe_government_subsidies_crore_bdt, soe_net_profit_loss_crore_bdt, soe_operating_revenue_crore_bdt
Sovereign Media & Investigative Coverage
6 verified reportsAuthentic policy, governance, and institutional reports from BDPolicyLab's 108k sovereign news corpus.
Renewable energy
Video goes viral
Energy situation
Legal basis
-
Electricity Act 2018
(2018)
· governed by
· act
Act I of 2018