Infrastructure and public assets. Part of what the twin can answer. Every figure below is the value the route serves, with its source; the raw response is at /api/twin/brain/infra.
Descriptive, sourced: no model
Basis: sourced records (URL, sha256 or locator per row), no model.
As of: Assets: directories as fetched for the twin lake (dates per row in the source tables); Rhd roads: 2023 (Table 7.06); national series to survey year 2022 (Table 7.05); Lged roads: FY2022-23 (Table 7.08); Population: Census 2022; Adp: Revised ADP 2025-26.
The 20 RADP 2025-26 projects with the largest current approved cost. A twin ranking, not an official megaproject list.
| Project (as printed) | Ministry | Approved cost | Spent to date | Share spent | Ends |
|---|---|---|---|---|---|
| রুপপুর পারমানবিক বিদ্যুৎ কেন্দ্র নির্মাণ (১ম সংশোধিত) | Ministry: Ministry of Science and Technology | Approved cost: Tk 138,685.77 crore |
For each of four measures per 100,000 residents (Census 2022), the 10 districts with the lowest value; a district's count is the number of measures it is among those lowest. Counted sites and RHD km, not need, capacity, quality or travel time. A district whose own rows of a measure are unplaced has no value or rank on it (see unplaced).
| District | Measures in the lowest 10 | Road km | Health facilities | Primary schools | Field offices |
|---|---|---|---|---|---|
| Dhaka | Measures in the lowest 10: 4 | Road km: |
| Body | Public assets | Districts |
|---|---|---|
| Directorate of Primary Education | Public assets: 66,623 | Districts: 64 |
| Directorate General of Health Services | Public assets: 20,477 | Districts: |
| Type | Group | Objects | Placed in a district |
|---|---|---|---|
| Primary school |
gov_primary_schools_per_100k: unplaced rows of this measure print this districtbridges_transport_structures, sovereign_*) are not manifest-pinned and carry no source file or sha256, so they are not read.lowest_per_head.unplaced, not moved.| Share spent: 68.28% |
| Ends: 30/06/2028 |
| মাতারবাড়ি ২×৬০০ মেঃ ওঃ আল্ট্রা সুপার ক্রিটিক্যাল কোল ফায়ার্ড পাওয়ার প্রজেক্ট (১ম সংশোধিত) | Ministry: Power Division | Approved cost: Tk 56,693.9 crore | Spent to date: Tk 48,877.46 crore | Share spent: 86.21% | Ends: 31/12/2026 |
| ঢাকা ম্যাস র্যাপিড ট্রানজিট ডেভেলপমেন্ট প্রজেক্ট (লাইন-১) | Ministry: Road Transport and Highways Division | Approved cost: Tk 53,977.06 crore | Spent to date: Tk 3,176.92 crore | Share spent: 5.89% | Ends: 31/12/2026 |
| ঢাকা ম্যাস র্যাপিড ট্রানজিট ডেভেলপমেন্ট প্রজেক্ট (লাইন-৫):নর্দান রুট | Ministry: Road Transport and Highways Division | Approved cost: Tk 41,238.55 crore | Spent to date: Tk 5,011.86 crore | Share spent: 12.15% | Ends: 31/12/2028 |
| পদ্মা সেতু রেল সংযোগ (২য় সংশোধিত) | Ministry: Ministry of Railways | Approved cost: Tk 38,624.91 crore | Spent to date: Tk 33,670.76 crore | Share spent: 87.17% | Ends: 30/06/2026 |
| চতুর্থ প্রাথমিক শিক্ষা উন্নয়ন কর্মসূচি (পিইডিপি-৪) (২য় সংশোধিত) | Ministry: Ministry of Primary and Mass Education | Approved cost: Tk 32,803.48 crore | Spent to date: Tk 27,435.52 crore | Share spent: 83.64% | Ends: 30/06/2025 |
| ঢাকা ম্যাস র্যাপিড ট্রানজিট ডেভেলপমেন্ট প্রজেক্ট (লাইন-৬) (৩য় সংশোধিত) | Ministry: Road Transport and Highways Division | Approved cost: Tk 32,717.73 crore | Spent to date: Tk 25,604.55 crore | Share spent: 78.26% | Ends: 31/12/2028 |
| হযরত শাহজালাল আন্তর্জাতিক বিমানবন্দর সম্প্রসারণ (১ম পর্যায়) (২য় সংশোধিত) | Ministry: Ministry of Civil Aviation and Tourism | Approved cost: Tk 21,365.52 crore | Spent to date: Tk 18,504.77 crore | Share spent: 86.61% | Ends: 30/06/2026 |
| উপজেলা পর্যায়ে ৩২৯টি টেকনিক্যাল স্কুল ও কলেজ স্থাপন | Ministry: Technical and Madrasa Education Division | Approved cost: Tk 20,525.69 crore | Spent to date: Tk 105.96 crore | Share spent: 0.52% | Ends: 31/12/2025 |
| এক্সপানশন এন্ড স্ট্রেংদেনিং অব পাওয়ার সিস্টেম নেটওয়ার্ক আন্ডার ডিপিডিসি এরিয়া (১ম সংশোধিত) | Ministry: Power Division | Approved cost: Tk 20,468.42 crore | Spent to date: Tk 10,473.95 crore | Share spent: 51.17% | Ends: 25/11/2026 |
| সাসেক সড়ক সংযোগ প্রকল্প: এলেঙ্গা-হাটিকামরুল-রংপুর মহাসড়ক চার লেনে উন্নীতকরণ (২য় সংশোধিত) | Ministry: Road Transport and Highways Division | Approved cost: Tk 19,053.72 crore | Spent to date: Tk 14,879.01 crore | Share spent: 78.09% | Ends: 31/12/2026 |
| ঢাকা-আশুলিয়া এলিভেটেড এক্সপ্রেসওয়ে নির্মাণ (১ম সংশোধিত) | Ministry: Bridges Division | Approved cost: Tk 18,069.48 crore | Spent to date: Tk 11,735.17 crore | Share spent: 64.94% | Ends: 30/06/2026 |
| সাসেক ঢাকা সিলেট করিডোর সড়ক উন্নয়ন | Ministry: Road Transport and Highways Division | Approved cost: Tk 16,918.59 crore | Spent to date: Tk 2,590.89 crore | Share spent: 15.31% | Ends: 31/12/2026 |
| যমুনা রেল সেতু (১ম সংশোধিত) | Ministry: Ministry of Railways | Approved cost: Tk 16,780.96 crore | Spent to date: Tk 13,746.66 crore | Share spent: 81.92% | Ends: 31/12/2025 |
| সায়েদাবাদ পানি শোধনাগার (ফেজ-৩) (২য় সংশোধিত) | Ministry: Local Government Division | Approved cost: Tk 16,014.83 crore | Spent to date: Tk 159.61 crore | Share spent: 1% | Ends: 30/06/2029 |
| ঘোড়াশাল পলাশ ইউরিয়া ফার্টিলাইজার প্রকল্প (জিপিইউএফপি) (১ম সংশোধিত) | Ministry: Ministry of Industries | Approved cost: Tk 15,561.96 crore | Spent to date: Tk 2,985.52 crore | Share spent: 19.18% | Ends: 30/06/2026 |
| পাওয়ার গ্রীড নেটওয়ার্ক স্ট্রেংদেনিং প্রজেক্ট আন্ডার পিজিসিবি (সংশোধিত) | Ministry: Power Division | Approved cost: Tk 14,326.3 crore | Spent to date: Tk 7,601.74 crore | Share spent: 53.06% | Ends: 30/06/2027 |
| জয়দেবপুর-ঈশ্বরদী সেকশনে ডুয়েল গেজ ডাবল লাইন নির্মাণ | Ministry: Ministry of Railways | Approved cost: Tk 14,250.61 crore | Spent to date: Tk 396.73 crore | Share spent: 2.78% | Ends: 31/12/2027 |
| মাতারবারি বন্দর উন্নয়ন (সড়ক ও জনপথ অংশ) (২য় সংশোধিত) | Ministry: Ministry of Shipping | Approved cost: Tk 12,942.37 crore | Spent to date: Tk 1,458.31 crore | Share spent: 11.27% | Ends: 31/12/2029 |
| কালুরঘাটে কর্ণফুলী নদীর উপর একটি রেল কাম রোড সেতু নির্মাণ। | Ministry: Ministry of Railways | Approved cost: Tk 11,560.77 crore | Spent to date: Tk 0 crore | Share spent: not available | Ends: 31/12/2030 |
| Health facilities: 2.477 |
| Primary schools: 6.454 |
| Field offices: 1.276 |
| Narayanganj | Measures in the lowest 10: 4 | Road km: 6.483 | Health facilities: 6.293 | Primary schools: 14.018 | Field offices: 5.423 |
| Gazipur | Measures in the lowest 10: 4 | Road km: 7.83 | Health facilities: 6.46 | Primary schools: 14.8 | Field offices: 4.275 |
| Chittagong | Measures in the lowest 10: 4 | Road km: 10.219 | Health facilities: 8.616 | Primary schools: 24.767 | Field offices: 5.78 |
| Brahmanbaria | Measures in the lowest 10: 4 | Road km: 8.765 | Health facilities: 11.281 | Primary schools: 33.449 | Field offices: 10.041 |
| Narsingdi | Measures in the lowest 10: 3 | Road km: 14.057 | Health facilities: 11.801 | Primary schools: 29.948 | Field offices: 9.402 |
| Noakhali | Measures in the lowest 10: 3 | Road km: 14.935 | Health facilities: 11.474 | Primary schools: 34.589 | Field offices: 8.744 |
| Mymensingh | Measures in the lowest 10: 2 | Road km: 9.65 | Health facilities: 12.273 | Primary schools: 36.294 | Field offices: 8.035 |
| Comilla | Measures in the lowest 10: 2 | Road km: 14.02 | Health facilities: 12.862 | Primary schools: 33.933 | Field offices: 9.272 |
| Cox's Bazar | Measures in the lowest 10: 2 | Road km: 19.949 | Health facilities: 10.095 | Primary schools: 23.342 | Field offices: 11.724 |
| Jessore | Measures in the lowest 10: 2 | Road km: 11.006 | Health facilities: 15.734 | Primary schools: 41.936 | Field offices: 9.915 |
| Chuadanga | Measures in the lowest 10: 1 | Road km: 11.571 | Health facilities: 13.208 | Primary schools: 36.141 | Field offices: 13.776 |
| Sylhet | Measures in the lowest 10: 1 | Road km: 14.368 | Health facilities: 10.474 | Primary schools: 38.319 | Field offices: 11.589 |
| Feni | Measures in the lowest 10: 1 | Road km: 17.92 | Health facilities: 13.282 | Primary schools: 33.962 | Field offices: 14.009 |
| Gaibandha | Measures in the lowest 10: 1 | Road km: 11.08 | Health facilities: 16.626 | Primary schools: 57.255 | Field offices: 10.733 |
| Chapai Nababganj | Measures in the lowest 10: 1 | Road km: 12.591 | Health facilities: 11.332 | Primary schools: not available | Field offices: 11.114 |
| Shariatpur | Measures in the lowest 10: 1 | Road km: 10.999 | Health facilities: 17.226 | Primary schools: 54.072 | Field offices: 18.307 |
| Supreme Court of Bangladesh | Public assets: 4,298 | Districts: 64 |
| Directorate General of Family Planning | Public assets: 1,455 | Districts: 64 |
| Local Government Engineering Department | Public assets: 1,155 | Districts: 64 |
| Directorate of Secondary and Higher Education | Public assets: 1,035 | Districts: 64 |
| Department of Cooperatives | Public assets: 907 | Districts: 64 |
| Ministry of Education | Public assets: 772 | Districts: 0 |
| Bangladesh Police | Public assets: 637 | Districts: 64 |
| Department of Agricultural Extension | Public assets: 580 | Districts: 64 |
| Department of Social Services | Public assets: 580 | Districts: 64 |
| Department of Fisheries | Public assets: 578 | Districts: 64 |
| Election Commission of Bangladesh | Public assets: 575 | Districts: 64 |
| Department of Women Affairs | Public assets: 575 | Districts: 64 |
| Department of Fire Service and Civil Defence | Public assets: 572 | Districts: 64 |
The first 15 of 25 rows the route serves.
| Objects: 65,569 |
| Placed in a district: 64,128 |
| Field upazila | Group: Field office | Objects: 15,381 | Placed in a district: 15,363 |
| Community Clinic | Group: DGHS health facilities | Objects: 14,366 | Placed in a district: 14,366 |
| Field district | Group: Field office | Objects: 3,602 | Placed in a district: 3,596 |
| Union Health Center | Group: DGHS health facilities | Objects: 3,161 | Placed in a district: 3,161 |
| District judge | Group: Subordinate courts | Objects: 2,266 | Placed in a district: 2,266 |
| Union Health Sub Center | Group: DGHS health facilities | Objects: 1,313 | Placed in a district: 1,313 |
| Chief judicial magistrate | Group: Subordinate courts | Objects: 1,284 | Placed in a district: 1,284 |
| Secondary school | Group: Education institutions | Objects: 772 | Placed in a district: 0 |
| Union Health & Family Welfare Center (UH&FWC) | Group: DGHS health facilities | Objects: 769 | Placed in a district: 768 |
| LGED upazila office | Group: LGED offices | Objects: 490 | Placed in a district: 0 |
| Field division | Group: Field office | Objects: 472 | Placed in a district: 0 |
| Tribunals | Group: Subordinate courts | Objects: 441 | Placed in a district: 441 |
| Upazila Health Complex | Group: DGHS health facilities | Objects: 434 | Placed in a district: 434 |
| Chief metropolitan magistrate | Group: Subordinate courts | Objects: 205 | Placed in a district: 205 |
The first 15 of 98 rows the route serves.
| Fiscal year | Road type | Roads | Length | Paved | Paved share |
|---|---|---|---|---|---|
| 2017-18 | Road type: Total | Roads: 150,740 | Length: 353,141 km | Paved: 114,015 km | Paved share: 32.29% |
| 2017-18 | Road type: Union | Roads: 8,057 | Length: 41,863 km | Paved: 27,532 km | Paved share: 65.77% |
| 2017-18 | Road type: Upazila | Roads: 4,791 | Length: 37,598 km | Paved: 32,898 km | Paved share: 87.5% |
| 2017-18 | Road type: Village | Roads: 137,892 | Length: 273,680 km | Paved: 53,585 km | Paved share: 19.58% |
| 2018-19 | Road type: Total | Roads: 151,120 | Length: 353,332 km | Paved: 116,419 km | Paved share: 32.95% |
| 2018-19 | Road type: Union | Roads: 8,056 | Length: 41,828 km | Paved: 28,200 km | Paved share: 67.42% |
| 2018-19 | Road type: Upazila | Roads: 4,764 | Length: 37,254 km | Paved: 33,323 km | Paved share: 89.45% |
| 2018-19 | Road type: Village | Roads: 138,300 | Length: 274,250 km | Paved: 54,896 km | Paved share: 20.02% |
| 2019-20 | Road type: Total | Roads: 151,146 | Length: 353,353 km | Paved: 131,851 km | Paved share: 37.31% |
| 2019-20 | Road type: Union | Roads: 7,843 | Length: 41,781 km | Paved: 31,060 km | Paved share: 74.34% |
| 2019-20 | Road type: Upazila | Roads: 4,478 | Length: 36,876 km | Paved: 34,022 km | Paved share: 92.26% |
| 2019-20 | Road type: Village | Roads: 138,825 | Length: 274,696 km | Paved: 66,769 km | Paved share: 24.31% |
| 2020-21 | Road type: Total | Roads: 151,146 | Length: 353,353 km | Paved: 136,528 km | Paved share: 38.64% |
| 2020-21 | Road type: Union | Roads: 7,843 | Length: 41,781 km | Paved: 33,007 km | Paved share: 79% |
| 2020-21 | Road type: Upazila | Roads: 4,478 | Length: 36,876 km | Paved: 35,124 km | Paved share: 95.25% |
| 2020-21 | Road type: Village | Roads: 138,825 | Length: 274,696 km | Paved: 68,397 km | Paved share: 24.9% |
| 2021-22 | Road type: Total | Roads: 147,029 | Length: 338,922 km | Paved: 150,583 km | Paved share: 44.43% |
| 2021-22 | Road type: Union | Roads: 8,074 | Length: 41,868 km | Paved: 32,482 km | Paved share: 77.58% |
| 2021-22 | Road type: Upazila | Roads: 4,718 | Length: 36,708 km | Paved: 34,022 km | Paved share: 92.68% |
| 2021-22 | Road type: Village | Roads: 134,237 | Length: 260,346 km | Paved: 84,079 km | Paved share: 32.3% |
| 2022-23 | Road type: Total | Roads: 164,301 | Length: 372,755 km | Paved: 156,349 km | Paved share: 41.94% |
| 2022-23 | Road type: Union | Roads: 8,078 | Length: 41,880 km | Paved: 32,862 km | Paved share: 78.47% |
| 2022-23 | Road type: Upazila | Roads: 4,719 | Length: 36,712 km | Paved: 34,131 km | Paved share: 92.97% |
| 2022-23 | Road type: Village | Roads: 151,504 | Length: 294,163 km | Paved: 89,356 km | Paved share: 30.38% |
twin_assets), the national field-office footprint (twin_footprint) and the two-reader operational site lists of national bodies. dataset twin_assets, twin_footprint, national_body_operational_sitesA count of listed sites, not of capacity, staff, condition or use: a community clinic and a district hospital count one each. Public = an Asset with an `operates` link to a Body (a directory row printed as operated, held on concession or supervised, a counted footprint office, or a body's own site list); rows printed as `lists` or `affiliates`, mostly private and MPO institutions, are not public. A site is placed in a district only where its printed district matched admin_units.infra_rhd_district_roads, infra_rhd_network_nationalRHD roads only: national, regional and zilla highways. Roads of LGED, city corporations, municipalities and district councils are not in these tables. Twelve districts print a blank class (served as null, not zero). Printed district totals differ from the sum of their classes by up to 0.01 km (rounding in the print). The yearbook's download URL was not recorded with the file; the file is named by its sha256.infra_lged_rural_roadsNational only; no district table is held. Printed paved plus unpaved length differs from the printed total in 10 of 24 rows (by 1 to 707 km; FY2020-21 Union and Village by +707 and -701 km), so the paved share is paved over the printed total and the gap is served beside it.infra_rhd_district_roadsCounted residents, June 2022, copied into the RHD table by the builder from the pinned census table (census2022_population_by_district, sha256 e2ada49d...).adp_projects), with the body each ministry maps to (adp_portfolio_members_queue45), the ADP 2026-27 project list (Project objects) and the district the title names (adp_project_place_adpplace). dataset adp_projects, adp_portfolio_members_queue45, adp_2026_27_projects, adp_project_place_adpplaceCost is the current approved project cost printed in the RADP row (Tk lakh, served in crore). The revision is read from the title, which prints it in Bangla, e.g. (২য় সংশোধিত) for the second revision. Cumulative expenditure is the row's cumul_exp_total; the row does not print the date it runs to.