Ministry of Fisheries and LivestockBudget 2026-27 · awards 18 May 2016 to 22 September 2026
BackHop 1 of 8
Trace one taka · 2026-27
Budget 2026-27: Tk 2,728 crore. Follow the records from the budget line to the offices, contracts, places and contractors they reach, one hop at a time, each with its source and status. One taka is a way to follow the records, not a claim that a single taka can be tracked end to end.
The budget is one year, 2026-27. Award figures add up every award dated 18 May 2016 to 22 September 2026, unless marked as dated in 2026-27. The two are not the same quantity.
Hop 1 of 8
Tk 2,728 crore
Ministry of Finance, Budget Speech FY2026-27, Table-5: Ministry/Division-wise Budget Allocation (hosted by NBR) · page 190sha256 ca081f6b33368faf…
Allocated to this division for fiscal year 2026-27. The registry budget line for the same year totals 2,727.52 crore BDT.
Method: Table-5 allocation, keyed by division code
Hop 2 of 8
3 demand units
Ministry of Finance, Demands for Grants FY2026-27 · page not recordedsha256 57bd61e2b6d98b1b…
The award is linked to the unit that received this allocation, not to a specific project line. 4,470 resolved, 1,017 missing of 5,487 award rows. Missing: 540 awards because the body's organisation is a registry entity, but no Demand-for-Grants unit is identified with it; 477 awards because the body's organisation in the e-GP organogram resolves to no registry entity below the ministry. Each unit's allocation is printed for one fiscal year; its awards span the whole harvest window. The two are shown side by side, never as a share.
Method: procuring body's organisation node in the e-GP organogram -> registry entity -> the Demand-for-Grants unit whose MBF project lines the ADP assigns to that entity (each unit's evidence names the ADP year read)
Hop 3 of 8
144 division code
Budget Speech FY2026-27, Table 5, page 190sha256 ca081f6b33368faf…
Crosswalk row status is PROPOSED: the match is proposed, not accepted.
Method: exact_normalised
Hop 4 of 8
405 procuring bodies
e-GP procuring entity organogram · page not recordedThe link opens the portal home page, not the individual record.
5,487 resolved of 5,487 award rows.
Method: B1_acronym_paren+A1_division_name_exact
Hop 5 of 8
Tk 5,436.75 crore
e-GP contract award notices · page not recordedThe link opens the portal home page, not the individual record.
5,487 awards. 5,287 resolved, 200 proposed of 5,487 award rows. A proposed award is one attached to its procuring body by a longest-common-prefix match rather than a unique tender path, or one whose amount reads 0, which the harvest cannot tell from an unparsed cell.
Method: NCT, OTM
Dated in fiscal year 2026-27: 212 awards, Tk 142.93 crore.
Largest awards first, restricted to awards with no hop missing other than demand_unit, whose status each sample reports.
Tk 96.97 crore
e-GP portal, home page: the notice itself is not linked
Tk 90.6 crore
e-GP portal, home page: the notice itself is not linked
Tk 69.29 crore
e-GP portal, home page: the notice itself is not linked
Tk 63.72 crore
e-GP portal, home page: the notice itself is not linked
Tk 57.59 crore
e-GP portal, home page: the notice itself is not linked
Hop 6 of 8
61 districts
from 65 district-name spellings on the award notices
Admin units (district tier) · page not recorded
65 of 65 district-name spellings on these awards resolve to 61 of Bangladesh's 64 districts. 5,487 resolved of 5,487 award rows. 805 of them resolve through the alias table (2018 official respelling or a transliteration variant).
Method: district string matched to admin_units.title_en, directly or through the district alias table (docs/research/2026-09-22-district-aliases)
A district here is the one recorded on the award notice. The award records carry no project location.
Hop 7 of 8
1,174 contractors
Derived from e-GP award notices · page not recordedThe link opens the portal home page, not the individual record.
5,486 resolved, 1 missing of 5,487 award rows.
Method: contractor_id from the award notice
Hop 8 of 8
2 gazette decisions
Bangladesh Gazette decisions · page not recordedsha256 fcbd8b41650bd98c…
2 gazette decisions issued by this entity, dated 2026-06-02 to 2026-06-02, inside the held window 2026-04-06 to 2026-09-17. They are the entity's own instruments, not the approval of any single contract below.
Method: issuing_entity_id on the gazette decision
The whole chain
Budget code match: Crosswalk row status is PROPOSED: the match is proposed, not accepted.
The simulation below spreads a budget change over observed award shares. It is a separate calculation, not a continuation of this evidence.
Entity
Ministry of Fisheries and Livestock
The trace above is the only entity offered here.
Request: window 2023-24 to 2025-26, 1,000 bootstrap draws, seed 7.
Choose a change to ask the engine. Nothing is drawn until it answers.